
Type A1
- Built-up872 sq ft
- ViewKLCC View
- Layout3 Bedroom
- Key typeSingle-key
- FurnishingSemi-Furnished
- Car Park1 Bay
KL360 rises on a rare 1.5-acre freehold site in Kuala Lumpur's urban core, directly above Raja Uda MRT Station. Entrance D is about 60m from the tower, roughly a minute's walk to the platform.
A full panoramic deck offering uninterrupted views across Kuala Lumpur, from KLCC to TRX and beyond.
Walk above the city on a glass floor: a direct visual connection to the streets far below.
A glowing descent that turns every arrival into an experience of its own, where architecture becomes an attraction.
A freehold, transit-integrated address in the heart of Kuala Lumpur: built for guest demand, guaranteed yield, and long-term value.
Raja Uda MRT sits directly beneath the tower: Entrance D is about 60m away, roughly a 1-minute walk to the platform.
2 stops to Persiaran KLCC/Petronas Twin Towers, 4 stops to Tun Razak Exchange with a change to the Kajang Line toward Bukit Bintang.
A freehold, 61-storey tower rising roughly 223m on a rare 1.5-acre site directly above an MRT station.
China State Construction Engineering (CSCEC) is the main contractor, with Veritas Architects leading design.
780 serviced apartments, 5 penthouses, 221 office suites, and 20 retail shops in a single integrated tower.
20 layout types from 450–939 sq ft across KLCC- and Urban-facing wings, including 4 dual-key options.
Raja Uda MRT sits directly beneath the tower: Entrance D is about 60m away, roughly a 1-minute walk to the platform.
2 stops to Persiaran KLCC/Petronas Twin Towers, 4 stops to Tun Razak Exchange with a change to the Kajang Line toward Bukit Bintang.
A freehold, 61-storey tower rising roughly 223m on a rare 1.5-acre site directly above an MRT station.
China State Construction Engineering (CSCEC) is the main contractor, with Veritas Architects leading design.
780 serviced apartments, 5 penthouses, 221 office suites, and 20 retail shops in a single integrated tower.
20 layout types from 450–939 sq ft across KLCC- and Urban-facing wings, including 4 dual-key options.
Freehold tenure and a transit-integrated address are two of the strongest supports for long-term liquidity in the Klang Valley market. A site built directly above an MRT line tends to sustain both resale demand and rental performance well beyond a typical launch cycle.
Up to 55,000 sq ft of facilities across 15 unique themes: amenities designed to appeal to short-stay guests as much as long-term residents.
From 450 sq ft studios to 939 sq ft Dual Key residences: choose KLCC-facing or Urban-facing wings.




















No layouts match the selected filters.
Since 2015, GD Holdings has delivered four fully completed developments across Negeri Sembilan, with vacant possession handed over on the ground, not just promised on paper. KL360 is built by China State Construction Engineering (CSCEC), with design by Veritas Architects.
0
Completed Developments
RM0.2B+
Cumulative Completed GDV
0
Most Recent Completion — Youth City
Delivered & Operated By
KL360 is located directly above Raja Uda MRT Station (Putrajaya Line) in Kuala Lumpur's urban core, on a 1.5-acre freehold site.
KL360 is a 100% freehold development.
Yes. Foreign purchasers may buy at KL360, subject to a minimum price of RM1,000,000 per unit and prevailing state authority regulations. A 30% Bumiputera quota applies, in line with standard Malaysian property regulations; there is no separate foreign ownership quota.
Yes. KL360 sits directly above Raja Uda MRT Station (Entrance D approximately 60m away): 2 stops to Persiaran KLCC/Petronas Twin Towers, 4 stops to Tun Razak Exchange (TRX) with a change to the Kajang Line.
20 layout types from 450 to 939 sq ft, split between KLCC-facing and Urban-facing wings, including 4 dual-key layouts (Types C, H, L, and P).
All units are semi-furnished with a wardrobe, kitchen cabinet (including hob and hood), sink and tap, air-conditioning, and a water heater. Per the developer's own FAQ, only the three 3-bedroom layouts — Types A1, H, and P — are allocated 1 car park bay each; the developer's materials do not state a car park allocation for the remaining 17 layouts. Confirm car park allocation for your specific unit with the sales team before booking.
The largest of the 20 published layouts is Type P at 939 sq ft. KL360 also includes a limited number of penthouses and corner suites, which are reserved for private viewing and enquiry rather than public listing. Contact us directly for details.
1,026 total units in a single 61-storey tower: 780 serviced apartments, 5 penthouses, 221 office suites, and 20 retail shops.
Construction takes approximately 54 months from SPA execution, targeting completion by Q2 2030. Exclusive preview opened 30 April 2026, with official launch tentatively set for June 2026.
KL360 is developed by GD Smart Township Sdn Bhd (GD Holdings), built by China State Construction Engineering (CSCEC), with design by Veritas Architects.
The residential component (serviced apartments and penthouses) is expected to fall under the standard Schedule H sale and purchase agreement, with staged payments tied to construction milestones and developer liability for Liquidated Ascertained Damages (LAD) on delay. Confirm coverage for the office and retail components directly with the sales gallery.
Guaranteed yield terms, current unit availability, and Sales Gallery appointments are shared directly: reach out on WhatsApp for the latest figures.